User Guide Cancel

Draw with the Pen tools

  1. Photoshop User Guide
  2. Introduction to Photoshop
    1. Dream it. Make it.
    2. What's new in Photoshop
    3. Edit your first photo
    4. Create documents
    5. Photoshop | Common Questions
    6. Photoshop system requirements
    7. Get to know Photoshop
    8. Keep Photoshop up to date
  3. Photoshop and other Adobe products and services
    1. Work with Illustrator artwork in Photoshop
    2. Work with Photoshop files in InDesign
    3. Substance 3D Materials for Photoshop
    4. Use the Capture in-app extension in Photoshop
  4. Photoshop on the iPad (not available in mainland China)
    1. Photoshop on the iPad | Common questions
    2. Get to know the workspace
    3. System requirements | Photoshop on the iPad
    4. Create, open, and export documents
    5. Add photos
    6. Work with layers
    7. Draw and paint with brushes
    8. Make selections and add masks
    9. Retouch your composites
    10. Work with adjustment layers
    11. Adjust the tonality of your composite with Curves
    12. Apply transform operations
    13. Crop and rotate your composites
    14. Rotate, pan, zoom, and reset the canvas
    15. Work with Type layers
    16. Work with Photoshop and Lightroom
    17. Get missing fonts in Photoshop on the iPad
    18. Japanese Text in Photoshop on the iPad
    19. Manage app settings
    20. Touch shortcuts and gestures
    21. Keyboard shortcuts
    22. Edit your image size
    23. Livestream as you create in Photoshop on the iPad
    24. Correct imperfections with the Healing Brush
    25. Create brushes in Capture and use them in Photoshop on the iPad
    26. Work with Camera Raw files
    27. Create and work with Smart Objects
    28. Adjust exposure in your images with Dodge and Burn
    29. Auto adjustment commands in Photoshop on the iPad
    30. Smudge areas in your images with Photoshop on the iPad
    31. Saturate or desaturate your images using Sponge tool
    32. Content aware fill for iPad
  5. Photoshop on the web (not available in mainland China)
    1. Common questions
    2. System requirements
    3. Keyboard shortcuts
    4. Supported file types
    5. Introduction to the workspace
    6. Open and work with cloud documents
    7. Generative AI features
    8. Basic concepts of editing
    9. Quick Actions
    10. Work with layers
    11. Retouch images and remove imperfections
    12. Make quick selections
    13. Image improvements with Adjustment Layers
    14. Add a fill layer
    15. Move, transform, and crop images
    16. Draw and paint
    17. Draw and edit Shapes
    18. Work with Type layers
    19. Work with anyone on the web
    20. Manage app settings
    21. Generate Image
    22. Generate Background
    23. Reference Image
  6. Photoshop (beta) (not available in mainland China)
    1. Get started with Creative Cloud Beta apps
    2. Photoshop (beta) on the desktop
    3. Reference Image
  7. Generative AI (not available in mainland China) 
    1. Common questions on generative AI in Photoshop
    2. Generative Fill in Photoshop on the desktop
    3. Generate Image with descriptive text prompts
    4. Generative Expand in Photoshop on the desktop
    5. Replace background with Generate background
    6. Get new variations with Generate Similar
    7. Generative Fill in Photoshop on the iPad
    8. Generative Expand in Photoshop on the iPad
    9. Generative AI features in Photoshop on the web
  8. Content authenticity (not available in mainland China)
    1. Content credentials in Photoshop
    2. Identity and provenance for NFTs
    3. Connect accounts for creative attribution
  9. Cloud documents (not available in mainland China)
    1. Photoshop cloud documents | Common questions
    2. Photoshop cloud documents | Workflow questions
    3. Manage and work with cloud documents in Photoshop
    4. Upgrade cloud storage for Photoshop
    5. Unable to create or save a cloud document
    6. Solve Photoshop cloud document errors
    7. Collect cloud document sync logs
    8. Invite others to edit your cloud documents
    9. Share files and comment in-app
  10. Workspace
    1. Workspace basics
    2. Preferences
    3. Learn faster with the Photoshop Discover Panel
    4. Create documents
    5. Place files
    6. Default keyboard shortcuts
    7. Customize keyboard shortcuts
    8. Tool galleries
    9. Performance preferences
    10. Use tools
    11. Presets
    12. Grid and guides
    13. Touch gestures
    14. Use the Touch Bar with Photoshop
    15. Touch capabilities and customizable workspaces
    16. Technology previews
    17. Metadata and notes
    18. Place Photoshop images in other applications
    19. Rulers
    20. Show or hide non-printing Extras
    21. Specify columns for an image
    22. Undo and history
    23. Panels and menus
    24. Position elements with snapping
    25. Position with the Ruler tool
  11. Web, screen, and app design
    1. Photoshop for design
    2. Artboards
    3. Device Preview
    4. Copy CSS from layers
    5. Slice web pages
    6. HTML options for slices
    7. Modify slice layout
    8. Work with web graphics
    9. Create web photo galleries
  12. Image and color basics
    1. How to resize images
    2. Work with raster and vector images
    3. Image size and resolution
    4. Acquire images from cameras and scanners
    5. Create, open, and import images
    6. View images
    7. Invalid JPEG Marker error | Opening images
    8. Viewing multiple images
    9. Customize color pickers and swatches
    10. High dynamic range images
    11. Match colors in your image
    12. Convert between color modes
    13. Color modes
    14. Erase parts of an image
    15. Blending modes
    16. Choose colors
    17. Customize indexed color tables
    18. Image information
    19. Distort filters are unavailable
    20. About color
    21. Color and monochrome adjustments using channels
    22. Choose colors in the Color and Swatches panels
    23. Sample
    24. Color mode or Image mode
    25. Color cast
    26. Add a conditional mode change to an action
    27. Add swatches from HTML CSS and SVG
    28. Bit depth and preferences
  13. Layers
    1. Layer basics
    2. Nondestructive editing
    3. Create and manage layers and groups
    4. Select, group, and link layers
    5. Place images into frames
    6. Layer opacity and blending
    7. Mask layers
    8. Apply Smart Filters
    9. Layer comps
    10. Move, stack, and lock layers
    11. Mask layers with vector masks
    12. Manage layers and groups
    13. Layer effects and styles
    14. Edit layer masks
    15. Extract assets
    16. Reveal layers with clipping masks
    17. Generate image assets from layers
    18. Work with Smart Objects
    19. Blending modes
    20. Combine multiple images into a group portrait
    21. Combine images with Auto-Blend Layers
    22. Align and distribute layers
    23. Copy CSS from layers
    24. Load selections from a layer or layer mask's boundaries
    25. Knockout to reveal content from other layers
  14. Selections
    1. Get started with selections
    2. Make selections in your composite
    3. Select and Mask workspace
    4. Select with the marquee tools
    5. Select with the lasso tools
    6. Adjust pixel selections
    7. Move, copy, and delete selected pixels
    8. Create a temporary quick mask
    9. Select a color range in an image
    10. Convert between paths and selection borders
    11. Channel basics
    12. Save selections and alpha channel masks
    13. Select the image areas in focus
    14. Duplicate, split, and merge channels
    15. Channel calculations
  15. Image adjustments
    1. Replace object colors
    2. Perspective warp
    3. Reduce camera shake blurring
    4. Healing brush examples
    5. Export color lookup tables
    6. Adjust image sharpness and blur
    7. Understand color adjustments
    8. Apply a Brightness/Contrast adjustment
    9. Adjust shadow and highlight detail
    10. Levels adjustment
    11. Adjust hue and saturation
    12. Adjust vibrance
    13. Adjust color saturation in image areas
    14. Make quick tonal adjustments
    15. Apply special color effects to images
    16. Enhance your image with color balance adjustments
    17. High dynamic range images
    18. View histograms and pixel values
    19. Match colors in your image
    20. Crop and straighten photos
    21. Convert a color image to black and white
    22. Adjustment and fill layers
    23. Curves adjustment
    24. Blending modes
    25. Target images for press
    26. Adjust color and tone with Levels and Curves eyedroppers
    27. Adjust HDR exposure and toning
    28. Dodge or burn image areas
    29. Make selective color adjustments
  16. Adobe Camera Raw
    1. Camera Raw system requirements
    2. What's new in Camera Raw
    3. Introduction to Camera Raw
    4. Create panoramas
    5. Supported lenses
    6. Vignette, grain, and dehaze effects in Camera Raw
    7. Default keyboard shortcuts
    8. Automatic perspective correction in Camera Raw
    9. Radial Filter in Camera Raw
    10. Manage Camera Raw settings
    11. Open, process, and save images in Camera Raw
    12. Repair images with the Enhanced Spot Removal tool in Camera Raw
    13. Rotate, crop, and adjust images
    14. Adjust color rendering in Camera Raw
    15. Process versions in Camera Raw
    16. Make local adjustments in Camera Raw
  17. Image repair and restoration
    1. Remove Tool
    2. Remove objects from your photos with Content-Aware Fill
    3. Content-Aware Patch and Move
    4. Retouch and repair photos
    5. Correct image distortion and noise
    6. Basic troubleshooting steps to fix most issues
  18. Image enhancement and transformation
    1. Replace sky in your images
    2. Transform objects
    3. Adjust crop, rotation, and canvas size
    4. How to crop and straighten photos
    5. Create and edit panoramic images
    6. Warp images, shapes, and paths
    7. Vanishing Point
    8. Content-aware scaling
    9. Transform images, shapes, and paths
  19. Drawing and painting
    1. Paint symmetrical patterns
    2. Draw rectangles and modify stroke options
    3. About drawing
    4. Draw and edit shapes
    5. Painting tools
    6. Create and modify brushes
    7. Blending modes
    8. Add color to paths
    9. Edit paths
    10. Paint with the Mixer Brush
    11. Brush presets
    12. Gradients
    13. Gradient interpolation
    14. Fill and stroke selections, layers, and paths
    15. Draw with the Pen tools
    16. Create patterns
    17. Generate a pattern using the Pattern Maker
    18. Manage paths
    19. Manage pattern libraries and presets
    20. Draw or paint with a graphics tablet
    21. Create textured brushes
    22. Add dynamic elements to brushes
    23. Gradient
    24. Paint stylized strokes with the Art History Brush
    25. Paint with a pattern
    26. Sync presets on multiple devices
    27. Migrate presets, actions, and settings
  20. Text
    1. Add and edit the text
    2. Unified Text Engine
    3. Work with OpenType SVG fonts
    4. Format characters
    5. Format paragraphs
    6. How to create type effects
    7. Edit text
    8. Line and character spacing
    9. Arabic and Hebrew type
    10. Fonts
    11. Troubleshoot fonts
    12. Asian type
    13. Create type
  21. Filters and effects
    1. Use the Blur Gallery
    2. Filter basics
    3. Filter effects reference
    4. Add Lighting Effects
    5. Use the Adaptive Wide Angle filter
    6. Use the Oil Paint filter
    7. Use the Liquify filter
    8. Layer effects and styles
    9. Apply specific filters
    10. Smudge image areas
  22. Saving and exporting
    1. Save your files in Photoshop
    2. Export your files in Photoshop
    3. Supported file formats
    4. Save files in graphics formats
    5. Move designs between Photoshop and Illustrator
    6. Save and export video and animations
    7. Save PDF files
    8. Digimarc copyright protection
  23. Color Management
    1. Understanding color management
    2. Keeping colors consistent
    3. Color settings
    4. Duotones
    5. Work with color profiles
    6. Color-managing documents for online viewing
    7. Color-managing documents when printing
    8. Color-managing imported images
    9. Proofing colors
  24. Web, screen, and app design
    1. Photoshop for design
    2. Artboards
    3. Device Preview
    4. Copy CSS from layers
    5. Slice web pages
    6. HTML options for slices
    7. Modify slice layout
    8. Work with web graphics
    9. Create web photo galleries
  25. Video and animation
    1. Video editing in Photoshop
    2. Edit video and animation layers
    3. Video and animation overview
    4. Preview video and animations
    5. Paint frames in video layers
    6. Import video files and image sequences
    7. Create frame animations
    8. Creative Cloud 3D Animation (Preview)
    9. Create timeline animations
    10. Create images for video
  26. Printing
    1. Print 3D objects
    2. Print from Photoshop
    3. Print with color management
    4. Contact Sheets and PDF Presentations
    5. Print photos in a picture package layout
    6. Print spot colors
    7. Print images to a commercial printing press
    8. Improve color prints from Photoshop
    9. Troubleshoot printing problems | Photoshop
  27. Automation
    1. Creating actions
    2. Create data-driven graphics
    3. Scripting
    4. Process a batch of files
    5. Play and manage actions
    6. Add conditional actions
    7. About actions and the Actions panel
    8. Record tools in actions
    9. Add a conditional mode change to an action
    10. Photoshop UI toolkit for plug-ins and scripts
  28. Troubleshooting
    1. Fixed issues 
    2. Known issues
    3. Optimize Photoshop performance
    4. Basic troubleshooting
    5. Troubleshoot crash or freeze
    6. Troubleshoot program errors
    7. Troubleshoot scratch disk full errors
    8. Troubleshoot GPU and graphics driver issues
    9. Find missing tools
    10. Photoshop 3D | Common questions around discontinued features

Photoshop provides multiple Pen tools to suit your use cases and creative style:

  • The Curvature Pen tool lets you intuitively draw curves and straight segments.
  • The standard Pen tool lets you draw straight segments and curves with great precision.
  • The Freeform Pen tool lets you draw paths as if you were drawing with pencil on a piece of paper. 
  • The Magnetic Pen options let you draw a path that snaps to the edges of the defined areas in your image. 
  • The Content-Aware Tracing tool lets you automate the process for tracing images. (Technology Preview)

Use the Shift+P key combination to cycle through the tools in the Pen group.

Cycle through the Pen tools using the Shift+P key combination

You can use the pen tools in conjunction with the shape tools to create complex shapes. For more information about the modes in which you can draw with the Pen tools, see Drawing modes.

Note:

Before drawing with the Pen tool, you can create a new path in the Paths panel to automatically save the work path as a named path.

Content-Aware Tracing Tool

The Content-Aware Tracing Tool is being introduced as a Technology Preview in the October 2020 release of Photoshop and lets you create vector paths and selections by simply hovering over the edges of your image and clicking.

You can enable the Content-Aware Tracing Tool in Preferences > Technology Previews and then restart Photoshop.

 

Try out the Content-Aware Tracing Tool by following the below five simple steps:

 

  1. From the Pen tools group, select the Content-Aware Tracing Tool.

    Content-Aware Tracing Tool
    Content-Aware Tracing Tool

  2. Hover the cursor over the edge of an object to highlight it.

    Content-Aware Trace Pen Tool
    Highlight image edges

    Note:

    Different zoom levels will affect how Photoshop sees your image and thus how the tool identifies edges.

    For instance, if you're working with a lower resolution image, zooming out may help Photoshop easier identify an edge. Zooming in (100% or more) will result in the tool using the default 1-1 pixel resolution for identifying the edges.

  3. Click on the highlighted section to create a path.

    Content-Aware Tracing Tool
    Click highlighted edges to create a path

  4. To add to the path, hover over an adjacent edge to highlight a new section and hold the Shift key while clicking to extended the path. The pink line that appears indicates that you're adding a new section to the existing path.

    Content-Aware Tracing Tool
    Hold Shift and click to extend your path

  5. To delete an area from the path, hold down the Alt key (Windows) or Option key (Mac) while you click. You can also click and drag in a direction to remove larger sections.

    Content-Aware Trace Pen Tool
    Use Alt or Option while clicking to delete part of the path

Detail

While adjusting the Detail slider, Photoshop displays a preview of the edges that Photoshop sees. Moving the slider to the right increases the amount of edges Photoshop detects and moving to the left decreases the amount of detected edges.

Detail Slider
Detail slider

Tracing

Tracing modes (Detailed, Normal, and Simplified) adjust how detailed or textured the image is prior to processing the tracing.

Tracing
Tracing modes

Use Tracing together with the Detail slider to achieve your desired edges.

Curvature Pen tool

The Curvature Pen tool lets you draw smooth curves and straight line segments with equal ease. Create custom shapes in your designs or define precise paths to effortlessly fine-tune your images using this intuitive tool. While doing so, create, toggle, edit, add, or remove smooth or corner points without ever having to switch tools.

  1. From the Pen tools group, select the Curvature Pen tool.

  2. To create the first anchor point, click or tap anywhere in the document.

  3. Click/tap again to define the second anchor point and complete the first segment of the path. Click once (default) if you want the next segment of your path to be curved. Double-click if you want to draw a straight segment next.

    Note:

    The first segment of your path always appears as a straight line on the canvas initially. Depending on whether you draw a curved or a straight segment next, Photoshop adjusts it later. If the next segment you draw is curved, Photoshop makes the first segment curve smoothly in relation to the next segment.

  4. (Curved path) Using a mouse or on a touch device, drag the pointer to draw the next segment of your path. While the mouse button is pressed down, optimize the curve of the segment. The previous segment is automatically adjusted to keep the curve smooth.

    Optimize the curve of the segment while the mouse button is pressed down.

  5. (Curved path) Release the mouse button to drop the anchor point and complete the second segment.

  6. Draw additional segments and complete the path.

  7. When you're done drawing, press the Esc key.

Tips for working with the Curvature Pen tool

  • While dropping an anchor point, click once if you want the next segment of your path to be curved. Double-click if you want to draw a straight segment next. Photoshop creates smooth or corner points accordingly.
  • To convert a smooth anchor point to a corner point, or vice versa, double-click the point.
  • To move an anchor point, simply drag it around.
  • To delete an anchor point, click it and then press the Delete key. While the anchor point is deleted, the curve is retained and suitably adjusted in relation to the remaining anchor points.
Extra anchor point

Extra anchor point deleted; the curve is suitably adjusted

  • Drag an anchor point to adjust the curve. When you adjust a path segment in this manner, the adjoining path segments are automatically modified (rubber-band effect).
  • To introduce an additional anchor point, simply click in the middle of a path segment.
"Rubber band effect"

Pen tool

Draw straight line segments

The simplest path you can draw with the standard Pen tool is a straight line, made by clicking the Pen tool to create two anchor points. By continuing to click, you create a path made of straight line segments connected by corner points.

Photoshop Pen tool
Clicking the Pen tool creates straight segments.

  1. Select the Pen tool.
  2. Position the Pen tool where you want the straight segment to begin, and click to define the first anchor point (do not drag).
    Note:

    The first segment you draw will not be visible until you click a second anchor point. (Select the Rubber Band option in Photoshop to preview path segments.) Also, if direction lines appear, you’ve accidentally dragged the Pen tool; choose Edit > Undo, and click again.

  3. Click again where you want the segment to end (Shift-click to constrain the angle of the segment to a multiple of 45°).
  4. Continue clicking to set anchor points for additional straight segments.

    The last anchor point you add always appears as a solid square, indicating that it is selected. Previously defined anchor points become hollow, and deselected, as you add more anchor points.

  5. Complete the path by doing one of the following:
    • To close the path, position the Pen tool over the first (hollow) anchor point. A small circle appears next to the Pen tool pointer  when it is positioned correctly. Click or drag to close the path.

    • To leave the path open, Ctrl-click (Windows) or Command-click (Mac OS) anywhere away from all objects.

    To leave the path open, you can also select a different tool.

Draw curves with the Pen tool

You create a curve by adding an anchor point where a curve changes direction, and dragging the direction lines that shape the curve. The length and slope of the direction lines determine the shape of the curve.

Curves are easier to edit and your system can display and print them faster if you draw them using as few anchor points as possible. Using too many points can also introduce unwanted bumps in a curve. Instead, draw widely spaced anchor points, and practice shaping curves by adjusting the length and angles of the direction lines.

  1. Select the Pen tool.
  2. Position the Pen tool where you want the curve to begin, and hold down the mouse button.

    The first anchor point appears, and the Pen tool pointer changes to an arrowhead. (In Photoshop, the pointer changes only after you’ve started dragging.)

  3. Drag to set the slope of the curve segment you’re creating, and then release the mouse button.

    In general, extend the direction line about one third of the distance to the next anchor point you plan to draw. (You can adjust one or both sides of the direction line later.)

    Hold down the Shift key to constrain the tool to multiples of 45°.

    Photoshop Drawing the first point in a curve pen tool
    Drawing the first point in a curve

    A. Positioning Pen tool B. Starting to drag (mouse button pressed) C. Dragging to extend direction lines 

  4. Position the Pen tool where you want the curve segment to end, and do one of the following:
    • To create a C‑shaped curve, drag in a direction opposite to the previous direction line. Then release the mouse button.

    Photoshop pen tool second point in a curve
    Drawing the second point in a curve

    • To create an S‑shaped curve, drag in the same direction as the previous direction line. Then release the mouse button.

    Photoshop pen tool Drawing an S curve
    Drawing an S curve

    Note:

    To change the direction of the curve sharply, release the mouse button, and then Alt-drag (Windows) or Option-drag (Mac OS) the direction point in the direction of the curve. Release the Alt (Windows) or Option (Mac OS) key and the mouse button, reposition the pointer where you want the segment to end, and drag in the opposite direction to complete the curve segment.

  5. Continue dragging the Pen tool from different locations to create a series of smooth curves. Note that you are placing anchor points at the beginning and end of each curve, not at the tip of the curve.
    Note:

    Alt-drag (Windows) or Option-drag (Mac OS) direction lines to break out the direction lines of an anchor point.

  6. Complete the path by doing one of the following:
    • To close the path, position the Pen tool over the first (hollow) anchor point. A small circle appears next to the Pen tool pointer  when it is positioned correctly. Click or drag to close the path.

    • To leave the path open, Ctrl-click (Windows) or Command-click (Mac OS) anywhere away from all objects or select a different tool.

Draw straight lines followed by curves

  1. Using the Pen tool, click corner points in two locations to create a straight segment.
  2. Position the Pen tool over the selected endpoint. A small diagonal line, or slash, appears next to the Pen tool. To set the slope of the curved segment you’ll create next, click the anchor point, and drag the direction line that appears.

    Photoshop pen tool Drawing a straight segment followed by a curved segment
    Drawing a straight segment followed by a curved segment (part 1)

    A. Straight segment completed B. Positioning Pen tool over endpoint C. Dragging direction point 

  3. Position the pen where you want the next anchor point; then click (and drag, if desired) the new anchor point to complete the curve.
    Photoshop pen tool Drawing a straight segment followed by a curved segment
    Drawing a straight segment followed by a curved segment (part 2)

    A. Positioning Pen tool B. Dragging direction line C. New curve segment completed 

Draw curves followed by straight lines

  1. Using the Pen tool, drag to create the first smooth point of the curved segment, and release the mouse button.
  2. Reposition the Pen tool where you want the curved segment to end, drag to complete the curve, and release the mouse button.
  3. Select the Convert Point tool from the toolbox, and then click the selected end point to convert it from a smooth point to a corner point.
    Note:

    Press Alt (Windows) or Option (Mac OS) to temporarily change the Pen tool to the Convert Point tool.

  4. Select the Pen tool from the toolbox, position the Pen tool where you want the straight segment to end, and click to complete the straight segment.

Draw two curved segments connected by a corner

  1. Using the Pen tool, drag to create the first smooth point of a curved segment.
  2. Reposition the Pen tool and drag to create a curve with a second smooth point; then press and hold Alt (Windows) or Option (Mac OS) and drag the direction line toward its opposing end to set the slope of the next curve. Release the key and the mouse button.

    This process converts the smooth point to a corner point by splitting the direction lines.

  3. Reposition the Pen tool where you want the second curved segment to end, and drag a new smooth point to complete the second curved segment.
Photoshop pen tool Drawing two curves
Drawing two curves

A. Dragging a new smooth point B. Pressing Alt/Option to split direction lines while dragging, and swinging direction line up C. Result after repositioning and dragging a third time 

Finish drawing a path

  1. Complete a path in one of the following ways:
    • To close a path, position the Pen tool over the first (hollow) anchor point. A small circle appears next to the Pen tool pointer  when it is positioned correctly. Click or drag to close the path.

    • To leave a path open, Ctrl-click (Windows) or Command-click (Mac OS) anywhere away from all objects.

Settings in the Options bar

When you use the standard Pen tool, the following options are available in the options bar:

  • Auto Add/Delete, which lets you add an anchor point when you click a line segment or delete an anchor point when you click it.
  • Rubber Band, which lets you preview path segments as you move the pointer between clicks. To access this option, click the pop-up menu to the right of the Custom Shape icon.

Freeform Pen tool

The Freeform Pen tool lets you draw as if you were drawing with a pencil on paper. Anchor points are added automatically as you draw. You do not determine where the points are positioned, but you can adjust them once the path is complete. To draw with greater precision, use the Pen tool.

  1. Select the Freeform Pen tool .

  2. To control how sensitive the final path is to the movement of your mouse or stylus, click the inverted arrow next to the shape buttons in the options bar, and enter a value between 0.5 and 10.0 pixels for Curve Fit. A higher value creates a simpler path with fewer anchor points.

  3. Drag the pointer in the image. As you drag, a path trails behind the pointer. When you release the mouse, a work path is created.

  4. To continue the existing freehand path, position the pen pointer on an end point of the path, and drag.

  5. To complete the path, release the mouse. To create a closed path, drag the line to the initial point of the path (a circle appears next to the pointer when it is aligned).

Draw using the magnetic pen options

The Magnetic Pen is an option of the Freeform Pen tool that lets you draw a path that snaps to the edges of defined areas in your image. You can define the range and sensitivity of the snapping behavior, as well as the complexity of the resulting path. The Magnetic Pen and Magnetic Lasso tools share many of the same options.

  1. To convert the Freeform Pen tool to the Magnetic Pen tool  , select Magnetic in the options bar, or click the inverted arrow next to the shape buttons in the options bar, select Magnetic, and set the following:
    • For Width, enter a pixel value between 1 and 256. The Magnetic Pen detects edges only within the specified distance from the pointer.

    • For Contrast, enter a percentage value between 1 and 100 to specify the contrast required between pixels for that area to be considered an edge. Use a higher value for low-contrast images.

    • For Frequency, enter a value between 0 and 100 to specify the rate at which the Pen sets anchor points. A higher value anchors the path in place more quickly.

    • If you are working with a stylus tablet, select or deselect Pen Pressure. When this option is selected, an increase in pen pressure causes the width to decrease.

  2. Click in the image to set the first fastening point.
  3. To draw a freehand segment, move the pointer or drag along the edge you want to trace.

    The most recent segment of the border remains active. As you move the pointer, the active segment snaps to the strongest edge in the image, connecting the pointer to the last fastening point. Periodically, the Magnetic Pen adds fastening points to the border to anchor previous sections.

    Photoshop pen tool fastening points, and continue tracing
    Click to add fastening points, and continue tracing.

  4. If the border doesn’t snap to the desired edge, click once to add a fastening point manually and to keep the border from moving. Continue to trace the edge and add fastening points as needed. If you make a mistake, press Delete to remove the last fastening point.
  5. To dynamically modify the properties of the Magnetic Pen, do one of the following:
    • Alt-drag (Windows) or Option-drag (Mac OS) to draw a freehand path.

    • Alt-click (Windows) or Option-click (Mac OS) to draw straight segments.

    • Press the open square bracket key ([) to decrease the Magnetic Pen width by 1 pixel; press the close square bracket key (]) to increase the pen width by 1 pixel.

  6. Complete the path:
    • Press Enter (Windows) or Return (Mac OS) to end an open path.

    • Double-click to close the path with a magnetic segment.

    • Hold down Alt (Windows) or Option (Mac OS), and double-click to close the path with a straight segment.

Get help faster and easier

New user?